|
GE90-115B engine. GE Aviation photo |
At the Dubai Air Show Monday, the United Arab Emirates announced that it ordered 50 aircraft powered by two GE90-115B engines, and agreed to a 12-year maintenance, repair and overhaul contract for those engines. The total value over the life of the contract is $6 billion. The order will have an impact on multiple GE Aviation operations nationwide, including the 258-worker GE Aviation plant in Batesville, Miss. Workers there manufacture composite engine parts – fan stator, acoustic panels and fan platforms – for the GE90. (Source:
GE Aviation, 11/14/11)
Gulf Coast note: GE Aviation is also building a composite engine parts facility in Hattiesburg, Miss., and Auburn, Ala.