Tuesday, October 2, 2018
Contract: COLSA, $69.6M
COLSA Corp., Huntsville, Ala., has been awarded a $69,618,375 modification (P00039) to contract FA2486-16-F-0031 for Technical and Management Advisory Services Command, control, communications, computer, intelligence, surveillance and reconnaissance (C4ISR)/cyber support. The contractor will provide additional research, development, test and evaluation, and acquisition support services. Work will be performed at Eglin Air Force Base, Fla.; Hanscom AFB, Mass.; Gunter Annex, Ala.; Patrick AFB, Fla.; Edwards AFB, Calif.; Scott AFB, Ill.; Robins AFB, Ga.; Beale AFB, Calif.; Hill AFB, Utah; Langley AFB, Va.; and San Antonio, Texas, and is expected to be completed by Sept. 30, 2019. This modification involves foreign military sales to Australia, Belgium, Canada, Chile, Denmark, Egypt, Finland, France, India, Indonesia, Iraq, Japan, Jordan, Korea, Morocco, NATO, Netherlands, New Zealand, Norway, Oman, Poland, Portugal, Qatar, Romania, Saudi Arabia, Singapore, Taiwan, Thailand, Turkey, United Arab Emirates, and the United Kingdom. Fiscal 2019 research, development, test and evaluation funds; production funds; and operations and maintenance funds in the amount of $17,165,708 will be obligated at the time of award. Total cumulative face value of the contract is $183,437,730. Air Force Test Center, Eglin AFB, is the contracting activity. (Source: DoD, 10/01/18)
Contract: M1 Support, $12M
M1 Support Services, Denton, Texas, has been awarded a $12,047,564 modification (A00032) to contract FA3002-15-C-0006 for trainer maintenance services. Work will be performed at Sheppard Air Force Base, Texas; and Naval Air Station Pensacola, Fla., and is expected to be completed Sept. 30, 2019. The total cumulative face value of the contract is $76,720,526. Fiscal 2019 operations and maintenance funds in the amount of $6,023,939 will be obligated at the time of award. The 82nd Contracting Squadron, Sheppard AFB, is the administrative contracting activity. (Source: DoD, 10/01/18)
Saturday, September 29, 2018
Contract: Northrop, $10M
Northrop Grumman Systems Corp., Linthicum Heights, Md., has been awarded a $9,967,000 indefinite-delivery/indefinite-quantity contract for spare equipment, on-site technical support, repairs, upgrades, and travel. This contract provides for spare parts and technical services to support F-35 Reprogramming Labs. Work will be performed at Eglin Air Force Base, Fla; and Linthicum Heights and is expected to be complete by Sept. 27, 2023. This award is the result of a sole-source acquisition. Fiscal 2018 operations and maintenance funds in the amount of $267,487 are being obligated on the first task order at the time of award. Air Force Test Center, Specialized Contracting Branch, Eglin Air Force Base, is the contracting activity (FA2487-18-D-0006). (Source: DoD, 09/28/18)
Contract: Northrop, $7.7M
Northrop Grumman Systems Corp.-Amherst Systems Inc., Buffalo, N.Y., has been awarded a $7,680,000 indefinite-delivery/indefinite-quantity contract for spare equipment, on-site technical support, repairs, upgrades, and travel. This contract provides for spare parts and technical services to support F-35 reprogramming labs. Work will be performed at Eglin Air Force Base, Fla.; and in Buffalo and is expected to be completed by Sept. 28, 2024. This award is the result of a sole-source acquisition. Fiscal 2018 operations and maintenance funds in the amount of $493,741 are being obligated at the time of award. Air Force Test Center, Specialized Contracting Branch, Eglin Air Force Base, is the contracting activity (FA2487-18-D-0004). (Source: DoD, 09/28/18)
Contract: Telspan Data, $46.2M
Telspan Data LLC, Concord, Calif., has been awarded a $46,183,433 basic indefinite-delivery/indefinite-quantity contract for air data recorders (ADR), ground recorder systems (GRS), data replay systems (DRS) and support services. The contract provides for spare equipment, support services, and improvement of ADR, GRS, and DRS capabilities for use by the operational and test communities in support of the Air Force Test mission. Work will be performed in Concord and multiple continental U.S. military installations, and is expected to be completed by Sept. 28, 2024. This award is the result of a sole-source acquisition. Fiscal 2018 research, development, test and evaluation funds in the amount of $2,795,985 are being obligated at the time of award. Air Force Test Center, Specialized Contracting Branch, Eglin Air Force Base, Fla., is the contracting activity (FA2487-18-D-0016). (Source: DoD, 09/28/18)
Contract: Cherokee Nation, $22M
Cherokee Nation Management and Consulting LLC, Catoosa, Okla., has been awarded a $22,000,000 indefinitely-delivery/indefinite-quantity contract for civil engineering support services. The contract provides for responsive, flexible full-spectrum installation engineering services including installation engineer technical assistance (requirement planning, development, execution) and other support. Work will be performed at Eglin Air Force Base, Fla., and is expected to be complete by 2023. This award is the result of a sole-source acquisition. Fiscal 2018 operations and maintenance funds in the amount of $2,264,651 are being obligated at the time of award. Air Force Test Center, Eglin Air Force Base, is the contracting activity (FA2486-18-D-0010). (Source: DoD, 09/28/18)
Contract: Webb Electric, $16.5M
Webb Electric Co. of Florida Inc., Pensacola, Fla., has been awarded a $16,460,695 firm-fixed-price in support of the Airfield Lighting Phase 1&2 construction project. This contract provides all plant, labor, materials, equipment, transportation and supervision necessary to repair Scott Air Force Base, Ill., degraded airfield lighting. Work will be performed at Scott AFB and is expected to be completed November 2019. The award is the result of a source-selection acquisition with five offers received. Fiscal 2018 funds in the amount of $16,460,695 will be obligated at the time of award. 375th Contracting Squadron, Scott AFB, is the contracting activity (FA4407-18-R-0003). (Source: DoD, 09/28/18)
Contract: Speegle, $8M
Speegle Construction Inc., Niceville, Fla., was awarded an $8,007,902 firm-fixed-price contract for design and construction of a new 10,134 sq. ft. two-story addition at Eglin Air Force Base, Fla. Bids were solicited via the internet with one received. Work will be performed in Eglin Air Force Base with an estimated completion date of July 29, 2020. Fiscal 2018 military construction funds in the amount of $8,007,902 were obligated at the time of the award. U.S. Army Corps of Engineers, Mobile, Ala., is the contracting activity (W91278-18-C-0026). (Source: DoD, 09/28/18)
Contract: BCI, $13.7M
BCI Construction USA Inc., Pace, Fla., was awarded a $13,731,375 firm-fixed-price contract for headworks intake lifting equipment. Bids were solicited via the internet with two received. Work will be performed in Lancaster, Tenn.; Celina, Tenn.; and Jamestown, Ky., with an estimated completion date of Oct. 15, 2020. Fiscal 2018 river and harbor contributed funds in the amount of $13,731,375 were obligated at the time of the award. U.S. Army Corps of Engineers, Nashville, Tenn., is the contracting activity (W912P5-18-C-0019). (Source: DoD, 09/28/18)
Friday, September 28, 2018
F-35 crashes, pilot ejects
The U.S. military suffered its first crash of an F-35 when a Corps F-35B went down Friday at 11:45 a.m. outside Marine Corps Air Station Beaufort, S.C. The pilot safely ejected. The cause was not specified and the incident is under investigation. The aircraft, which cost more than $100 million, belonged to Marine Fighter Attack Training Squadron 501, which trains Marine pilots for combat with the F-35. (Source: Washington Post, 09/28/18) In unrelated F-35 news earlier in the week, the aircraft carrier Queen Elizabeth, Britain’s 65,000-ton re-entry into carrier aviation, marked a historic moment Tuesday when Royal Navy Commander Nathan Gray and Royal Air Force Squadron Leader Andy Edgell touched down the first F-35B on the deck of the aircraft carrier The ship was on patrolling the Eastern Seaboard of the U.S. They were the first two British pilots to land on a British aircraft carrier in eight years and it marked the beginning of the Royal Navy’s developmental trials slated to last about two months. (Source: Defense News, 09/28/18) Gulf Coast note: Eglin Air Force Base, Fla., is home of the F-35 integrated training center. Previous
Contract: UTC, $209.6M
United Technologies Corp., Pratt and Whitney Engines, East Hartford, Conn., is awarded $209,601,517 for modification P00002 to a previously awarded advance acquisition contract (N00019-18-C-1021) for additional long-lead materials, parts, and components in support of F-35 Lightning II low-rate initial production Lot 13 propulsion systems. This modification is in support of Air Force, Marine Corps, Navy, non-Department of Defense (DoD) participants, and Foreign Military Sales (FMS) customers. Work will be performed in East Hartford (67 percent); Indianapolis, Ind. (26.5 percent); and Bristol, United Kingdom (6.5 percent), and is expected to be completed in September 2021. Fiscal 2018 aircraft procurement (Air Force, Marine Corps, and Navy); non-DoD participant, and FMS funds in the amount of $209,601,517 will be obligated at time of award, none of which will expire at the end of the fiscal year. This modification combines purchases for the Air Force ($73,537,179; 35 percent); Marine Corps ($35,477,475; 17 percent); Navy ($21,888,984; 10 percent); non-DoD participants ($41,929,486; 20 percent); and FMS customers ($36,768,394; 18 percent). The Naval Air Systems Command, Patuxent River, Md., is the contracting activity. (Source: DoD, 09/27/18) Gulf Coast note: Eglin Air Force Base, Fla., is home of the F-35 integrated training center.
Contract: UTC, $39.3M
United Technologies Corp., Pratt and Whitney Military Engines, East Hartford, Conn., is awarded $39,266,691 for modification P00008 to a previously awarded fixed-price-incentive-firm target, cost-plus-incentive-fee, cost-plus-fixed-fee contract (N00019-17-C-0020). This modification provides for additional long lead-time components, parts, and materials in support of Lot 13 F-35 Lightning II propulsion systems in support of the Marine Corps, Air Force, Navy; non-Department of Defense (DoD); and Foreign Military Sales (FMS) customers. Work will be performed in East Hartford (67 percent); Indianapolis, Ind. (26.5 percent); and Bristol, United Kingdom (6.5 percent), and is expected to be completed in September 2021. Fiscal 2018 aircraft procurement (Marine Corps, Air Force, and Navy); non-DoD participant; and FMS funds in the amount of $30,439,813 will be obligated at time of award, none of which will expire at the end of the current fiscal year. This modification combines purchases for the Marine Corps ($29,054,685; 73.99 percent); Air Force ($582,821; 1.49 percent); Navy ($109,186; 0.28 percent); non-U.S. DoD participants ($9,228,392; 23.50 percent); and FMS customers ($291,607; 0.74 percent). The Naval Air Systems Command, Patuxent River, Md., is the contracting activity. (Source: DoD, 09/27/18) Gulf Coast note: Eglin Air Force Base, Fla., is home of the F-35 integrated training center.
Contract: Bell-Boeing, $10.8M
Bell-Boeing Joint Project Office, Amarillo, Texas, is awarded $10,810,033 for cost-plus-fixed-fee modification P00019 to a previously issued delivery order 0096 placed against basic ordering agreement N00019-12-G-0006 to procure 12 additional MV-22 Integrated Aircraft Survivability Equipment (IASE) retrofit A-Kits Block C; 12 MV-22 IASE retrofit kit installations; IASE configuration B retrofit A and B-Kit installation; and five CV-22 IASE advanced mission computer A-Kits. Work will be performed at Ridley Park, Pa. (81.9 percent); Fort Walton Beach, Fla. (17.7 percent); and Fort Worth, Texas (.4 percent), and is expected to be completed in August 2020. Fiscal 2018 aircraft procurement (Navy and Air Force) funds in the amount of $10,810,033 will be obligated at time of award, none of which will expire at the end of the current fiscal year. This modification combines purchases for the Navy ($9,577,130; 88 percent); and Air Force ($1,232,903; 12 percent). The Naval Air Systems Command, Patuxent River, Md., is the contracting activity. (Source: DoD, 09/27/18)
Contract: Arete Associates, $40.4M
Aretè Associates Inc., Northridge, Calif., is awarded a $40,378,366, firm-fixed-priced, cost-plus-fixed-fee, indefinite-delivery/indefinite-quantity requirements contract to provide coastal battlefield reconnaissance and analysis (COBRA) systems, COBRA program systems support, and provisioned item orders/spares for the AN/DVS-1 COBRA Block 1 System. This contract includes options which, if exercised, would bring the cumulative value of this contract to $93,000,000. Work will be performed in Tucson, Ariz. (35 percent); Destin, Fla. (35 percent); and Santa Rosa, Calif. (30 percent), and is expected to be completed by March 2021. Fiscal 2018 other procurement (Navy) funding in the amount of $16,618,453 will be obligated at time of award and will not expire at the end of the current fiscal year. This contract was not competitively procured in accordance with 10 U.S. Code 2304(c)(5), as implemented by Federal Acquisition Regulation 6.302-5(c)(2): Authorized or Required by Statutes, this is a Phase III Small Business Innovation Research (SBIR) contract award that is derived from, extends, or logically concludes efforts performed under prior SBIR contract N61331-11-C-0007. The Naval Surface Warfare Center Panama City Division, Panama City, Fla., is the contracting activity (N61331-18-D-0012). (Source: DoD, 09/27/18)
Contract: Lockheed, $29.3M
Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded $29,254,101 for firm-fixed-price delivery order N0001918F2494 against a previously issued basic ordering agreement (N00019-14-G-0020). This order provides for the procurement of various diminishing manufacturing sources parts to protect deliveries for future F-35 Lightning II lots. Work will be performed in Fort Worth and is expected to be completed in February 2019. Fiscal 2016 aircraft procurement (Air Force, Navy, and Marine Corps); non-Department of Defense (DoD) participant; and Foreign Military Sales (FMS) funds in the amount of $29,254,101 will be obligated at time of award, $10,589,608 of which will expire at the end of the fiscal year. This order combines purchases for the Air Force ($6,353,410; 21.72 percent); Marine Corps ($3,128,028; 10.69 percent); Navy ($1,108,170; 3.79 percent); non-DoD participants ($12,181,209; 41.64 percent); and FMS customers ($6,483,284; 22.16 percent). The Naval Air Systems Command, Patuxent River, Md., is the contracting activity. (Source: DoD, 09/27/18) Gulf Coast note: Eglin Air Force Base, Fla., is home of the F-35 integrated training center.
Contract: Lockheed, $116.3M
Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded $116,311,183 for firm-fixed-price delivery order N0001918F2048 against a previously issued basic ordering agreement (N00019-14-G-0020) for the procurement of 440 low-rate initial production 11 Generation 3 Helmet Mounted Display Systems, oxygen masks, and initial spares in support of the F-35 Lightning II aircraft for the Air Force (180); Navy (60); Marine Corps (69); non-Department of Defense (DoD) participants (119); and Foreign Military Sales (FMS) customers (12). Work will be performed in Fort Worth and is expected to be completed in October 2020. Fiscal 2016 aircraft procurement (Air Force, Navy, and Marine Corps); fiscal 2017 aircraft procurement (Air Force and Navy); fiscal 2018 aircraft procurement (Navy and Marine Corps); non-DoD participant, and FMS funds in the amount of $116,311,183 are being obligated at time of award, $70,826,314 of which will expire at the end of the current fiscal year. This contract combines purchases for the Air Force ($47,120,086; 40.5 percent); Navy ($15,711,725; 13.5 percent); Marine Corps ($18,944,511; 16.3 percent); non-DoD participant ($31,599,088; 27.2 percent); and FMS customers ($2,935,773; 2.5 percent). The Naval Air Systems Command, Patuxent River, Md., is the contracting activity. (Source: DoD, 09/27/18) Gulf Coast note: Eglin Air Force Base, Fla., is home of the F-35 integrated training center.
Contract: Lockheed, $315.8M
Lockheed Martin Corp., Fort Worth, Texas, is awarded $315,773,716 for modification P00004 to a previously awarded fixed-price incentive firm contract (N0001918C1048) to procure support equipment for F-35 Lightning low-rate initial production Lot XI aircraft in support of the Air Force, Marine Corps, Navy, and non-Department of Defense (DoD) participants. Work will be performed in Orlando, Fla. (31 percent); Redondo Beach, Calif. (25 percent); Fort Worth, Texas (13 percent); Hartford, Conn. (12 percent); Melbourne, Australia (8 percent); Rome, Italy (4 percent); Franklin, Ohio (4 percent); and Chatsworth, Calif. (3 percent), and is expected to be completed in September 2023. Fiscal 2016 and 2017 aircraft procurement (Air Force); fiscal 2017 and 2018 aircraft procurement (Navy); fiscal 2018 aircraft procurement (Marine Corps); and non-DoD Participant funds in the amount of $315,773,716 are being obligated at time of award, $29,911,537 of which will expire at the end of the current fiscal year. This contract combines purchases for the Air Force ($108,665,198; 34.41 percent); Navy ($31,062,358; 9.84 percent); Marine Corps ($5,186,434; 1.64 percent); and non-DoD participants ($170,859,726; 54.11 percent). The Naval Air Systems Command, Patuxent River, Md., is the contracting activity. (Source: DoD, 09/27/18) Gulf Coast note: Eglin Air Force Base, Fla., is home of the F-35 integrated training center.
Contract: Calculex, $46.6M
Calculex Inc., Las Cruces, N.M., has been awarded a $46,623,715 basic indefinite-delivery/indefinite-quantity contract for Air Data Recorders (ADR) and support services. The contract provides for spare equipment, support services, and improvement of ADR capabilities for use by the operational and test communities in support of the Air Force Test mission. Work will be performed in Las Cruces and multiple continental U.S. military installations, and is expected to be completed by Sept. 27, 2024. This award is the result of a sole-source acquisition. Fiscal 2018 research, development, test and evaluation funds in the amount of $282,795 are being obligated at the time of award. Air Force Test Center, Eglin Air Force Base, Fla., is the contracting activity (FA2487-18-F-2325). (Source: DoD, 09/27/18)
U.S. F-35 used in combat
The United States used an F-35 jet – a Marine Corps F-35B – against a Taliban target in Afghanistan on Thursday, marking the first U.S. combat use of the stealthy plane. The F-35B jet took off from the Wasp-class USS Essex (LHD 2) amphibious assault ship in the Arabian Sea in support of ground clearance operations. The F-35, made by Lockheed Martin Co, comes in three variants - the F-35A conventional take-off and landing model, the F-35B, a short take-off/vertical landing version, and the F-35C, used aboard aircraft carriers. In May, Israel became the first country to use the U.S.-made F-35 stealth fighter in combat. (Sources: Reuters, Naval Forces Central Command, Popular Mechanics, 09/27/18) Gulf Coast note: Eglin Air Force Base, Fla., is home of the F-35 integrated training center.
Thursday, September 27, 2018
Boeing wins T-X contract
The Boeing-Saab partnership has won a $9.2 billion contract to produce the next generation of Air Force training jets. The contract will allow the Air Force to buy up to 475 aircraft and 120 simulators, the Air Force said in a Sept. 27 statement, although the current plan is to buy 351 T-X aircraft, 46 simulators and associated ground equipment. Initial operating capability is planned by the end of fiscal 2024, with the first simulators arriving at Joint Base San Antonio-Randolph, Texas, in 2023. Full operational capability is projected for 2034. Saab promised that, should the partnership emerge victorious, it would build a new plant in the United States for its T-X work, although a location has not been announced. The other two teams competing for the contract were Leonardo DRS and Lockheed Martin. DRS’ T-100 is based on the Leonardo M-346 trainer, and the company announced its intention to do structural subassembly, final assembly and check out of the aircraft in Tuskegee, Ala., where it would build a new $200 million facility. Lockheed Martin and Korea Aerospace Industries wanted to build a modified version of KAI’s T-50. Lockheed said that its T-50A would be built in Greenville, S.C., where it also plans to fabricate the F-16 in the future. (Sources: Defense News, Boeing, 09/27/18) Previous
Subscribe to:
Posts (Atom)