Tuesday, April 2, 2019
Contract: Northrop, $7.2M
Northrop Grumman Systems Corp., San Diego, Calif., is being awarded a $7,241,880 advance acquisition contract modification (P00002) to a previously awarded cost-reimbursable contract (N00019-18-C-1028). This modification extends the period of performance and provides additional funding to procure long lead components, material, parts and associated efforts required to maintain the MQ-4C Triton Unmanned Aircraft System planned low rate initial production, lot 4 production schedule. Work will be performed in San Diego (25.3 percent); Baltimore, Md. (22.7 percent); Salt Lake City, Utah (20.2 percent); Bridgeport, W.Va. (8.2 percent); Red Oak, Texas (4.7 percent); Vandalia, Ohio (.2 percent); various locations within the continental U.S. (15.1 percent); and various locations outside the continental U.S. (3.6 percent), and is expected to be completed in May 2019. Fiscal 2018 aircraft procurement (Navy) funds in the amount of $7,241,880 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. (Source: DoD, 04/01/19) Gulf Coast note: Fuselage work on the Triton is done in Moss Point, Miss.