Tuesday, May 21, 2013
Two squadrons move to Hurlburt
EGLIN AIR FORCE BASE, Fla. -- Two Air Force squadrons moved to a new hangar Monday morning by running 15 miles across town. More than 50 people from the 9th Special Operations and the 1st Special Operations Maintenance squadrons ran a relay to carry their flags, or guidons, from their hangar at Eglin Air Force Base to their new home at Hurlburt Field. The move, discussed for more than 20 years, finally reunites all 1st Special Operations Wing squadrons under one roof. About 400 people and eight MC-130P Combat Shadow aircraft relocated. (Source: Northwest Florida Daily News, 05/20/13)
Monday, May 20, 2013
3 Gulf Coast bases win awards
Three bases in the Gulf Coast region were among five that won the Commander in Chief’s Annual Award for Installation Excellence. Secretary of Defense Chuck Hagel announced today that the 2013 award winners. The Gulf Coast bases are the U.S. Army Garrison Fort Rucker, Ala.; Naval Support Activity Panama City, Fla.; and Keesler Air Force Base, Biloxi, Miss. The other winners are Marine Corps Air Ground Combat Center Twentynine Palms, Calif., and Defense Logistics Agency Land and Maritime, Columbus, Ohio. The award recognizes the outstanding and innovative efforts of the people who operate and maintain U.S. military installations. The five recipients of this highly competitive presidential award were selected for their exemplary support of Department of Defense missions. (Source: DoD, 05/20/13) Previous
Saturday, May 18, 2013
728th ACS victim of cuts
EGLIN AIR FORCE BASE, Fla. -- One of the oldest squadrons in the Air Force has been shelved. The Air Force was just three years old when 728th Air Control Squadron was activated Sept. 2, 1950, at Turner Air Force Base in Albany, Ga. The squadron was inactivated Friday at Eglin Air Force Base as part of broad budget cuts in the Department of Defense. The 728th provided command and control of joint air operations by conducting surveillance, identification, weapons control, battle management and theater communications data links. The squadron moved to Duke Field in 1977 then Eglin in 1994. (Source: Northwest Florida Daily News, 05/17/13)
Drone marks another first
![]() |
| X-47B prepares for touch and go. Navy photo |
Friday, May 17, 2013
Female chair chosen
The New Orleans Aviation Board, which governs the city-owned Louis Armstrong International Airport, picked New Orleans lawyer Cheryl Teamer to be its first female chairperson. She will oversee the launch of an $826 million overhaul the airfield that Mayor Mitch Landrieu has dictated must be done in five years. Teamer was selected Thursday. (Source: New Orleans Times Picayune, 05/17/13)
Thursday, May 16, 2013
Army SFG welcomes public
EGLIN AIR FORCE BASE, Fla. -- The Army 7th Special Forces Group (Airborne) opened its doors Wednesday to the public. About 2,000 people showed up at the Special Forces' cantonment south of Crestview. The event was part of the group's Red Empire Week, designed to reunite soldiers with their families after year-long deployments to Afghanistan and to show appreciation for the community. Visitors Day featured about 15 displays for the public to inspect the weapons, vehicles and technologies soldiers use and to let them explain their day-to-day duties. (Source: Northwest Florida Daily News, 05/15/13)
Contract: Jacobs, $8.5M
Jacobs Technology Inc., Lincoln, Mass., was awarded an $8,527,294 cost-plus-fixed-fee and cost-reimbursable contract for interim support of services to provide engineering and technology acquisition support services. The types of services to be acquired under this contract includes but are not limited to: engineering services, engineering support, technical support, provisioning and logistics, modeling and simulation, configuration and data management, architectural support, test and evaluation, security engineering and certification, capability based planning, commercial-off-the-shelf integration, integrated master plans and scheduling and technical reviews. Work will be done at Hanscom Air Force Base, Mass., with primary geographically separated units at Peterson AFB, Colo.; Langley AFB, Va.; Eglin AFB, Fla.; Maxwell-Gunter AFB, Ala.; and Wright-Patterson AFB, Ohio, with an expected completion date of Nov. 15, 2013. The Air Force Life Cycle Management Center/PZM is the contracting activity. Contract has an FMS component as the contract requires company to travel overseas for host nation support. (Source: DoD, 05/16/13)
Australia eyes Triton again
Australia is back on board and again considering buying Northrop Grumman Triton long-range surveillance drones. The government will issue a letter of request to the United States to gain access to detailed cost, capability and availability information on the U.S. Navy's MQ-4C Triton. The drone is a variant of the long-range Global Hawk, but configured for maritime surveillance. Australia could buy six or seven Tritons, according to Reuters. The United States plans to buy 68. (Source: The Australian, 05/16/13) Previous: Germany axes Euro Hawk. Gulf Coast note: All variants of the Global Hawk are built in part in Moss Point, Miss.
Wednesday, May 15, 2013
A-1 marks a first in decade
![]() |
| The J-2X is installed on the A-1 stand. NASA/SSC photo |
Germany axes Euro Hawk
Germany's defense ministry plans to abandon the $1.3 billion Euro Hawk reconnaissance program. Flight clearance issues in European airspace were key factors, according to reports. One Euro Hawk demonstrator, a variant of the unmanned Northrop Grumman-built Global Hawk but with Europe-built sensors, has already been purchased. But plans four will now be canceled, officials said. (Sources: Deutsche Welle, AP via Fox News, AFP via Defense News, 05/15/13) Gulf Coast note: The central fuselage of the Euro Hawk was built by Northrop Grumman in Moss Point, Miss. Previous: Euro Hawk arrives in Germany
Tuesday, May 14, 2013
F-35s do aerial refueling
![]() |
| F-35 refueled over Eglin. Air Force photo |
Drone catapults from carrier
![]() |
| History made with X-47B launch Tuesday. U.S. Navy photo |
Orion repair being tested
Engineers are putting NASA's first space-bound Orion capsule through tests to stress the capsule's structural shell and check repairs to cracks in the pressurized module's aluminum bulkhead. It's set to fly in orbit in 2014. The static loads testing began May 3 and will run through June inside the Operations and Checkout Building at Kennedy Space Center, Fla. The pressure shell of the Orion spacecraft, comprised of welded olive-green aluminum-lithium metal panels, is being put through the tests to verify the capsule can withstand loads it will encounter during launch, re-entry and splashdown in the Pacific Ocean. The 16.5-foot-diameter spacecraft, built by Lockheed Martin Corp., was delivered to KSC in June 2012. Engineers put the capsule through its first test at KSC in November, when they pressurized the Orion crew module to check its integrity. The test was halted after technicians heard audible cracking sounds, and inspections showed three small cracks in the aft bulkhead on the lower half of the Orion spacecraft's pressure shell. The cracks materialized in three adjacent radial ribs of the aluminum bulkhead, according to NASA. Engineers designed structural braces to resolve the problem, and those repairs are being tested now. (Source: Spaceflight Now, 05/12/13) Gulf Coast note: The olive-green aluminum alloy core of the Orion was built at Michoud Assembly Facility, New Orleans. Previous: MAF-built Orion at KSC, NASA evaluating Orion cracks
Contract: Northrop, $555.6M
Northrop Grumman Systems Corp., Aerospace Systems Sector, San Diego, Calif., is being awarded a maximum ceiling $555,600,000 indefinite-delivery/indefinite-quantity contract for Global Hawk modernization. The tasks on each delivery will fall into, but are not limited to, the following categories: management, including program, business and technical areas; engineering efforts, including configuration management, data management, reliability, availability and maintainability, and related areas of concern such as technical refresh, diminishing manufacturing sources, etc.; studies and analyses; design, development, integration, test and evaluation; retrofit requirements; and integrated logistics support. Work will be performed in San Diego, and is expected to be completed by May 14, 2015. This award is the result of a sole source acquisition. Type of appropriation is fiscal 2012 and 2013 and obligations will be on subsequent individual task/delivery orders. The contracting activity is Air Force Life Cycle Management Center/WIGK, Wright-Patterson Air Force Base, Ohio. (Source: DoD, 05/13/13) Gulf Coast note: Global Hawk central fuselage work is done in Moss Point, Miss.
Monday, May 13, 2013
Kuwait, Airbus to sign deal
Kuwait Airways will buy 25 new Airbus jets and aims to lease a further 13 to upgrade its fleet, the Kuwaiti newspaper Daily Al-Watan reported. The deal is for 10 wide-bodied A350-900 jets and 15 of the A320neo The paper placed the value at $3.1 billion. Bloomberg also wrote that the deal between Airbus SAS and the airline is close and could be signed this month, but it placed the value at $4.4 billion based on list price. Deliveries would start in 2019. (Sources: Globe and Mail, Bloomberg, 05/12/13) Gulf Coast note: Airbus broke ground last month in Mobile, Ala., on an A320 final assembly line.
Saturday, May 11, 2013
Plans for old airport unveiled
PANAMA CITY, Fla. -- The St. Andrew Bay Land Co. unveiled plans for a large development on the old airport property. The Panama City Planning Board and Commission likely will vote on Phase I of the project this month. Construction is slated to begin in June. The 704-acre development called SweetBay will include 3,200 homes, 700,000 square feet of commercial space and the University Academy, parks, ponds and green space. The land became available when the airport moved to West Bay. The Airport Authority sold the property to St. Andrew Bay Land Co. for $51.4 million in February 2011. (Source: Panama City News Herald, 05/09/13)
FAA finds funds for towers
Small airport towers slated to close in June, including ones in Dothan, Ala., and Kiln, Miss., will remain open through the end of the fiscal year, Sept. 30. In a statement released Friday, Transportation Secretary Ray LaHood said the recent passage of a bill to free up funds and avoid sequester-related furloughs of some 47,000 FAA employees also provided the money to keep 149 airport towers open. The airport in Kiln is near NASA's Stennis Space Center. (Sources: al.com, Sun Herald, 05/10/13)
Dothan facility lands client
DOTHAN, Ala. – A month after Commercial Jet announced plans to open a $12 million facility at Dothan Regional Airport, the provider of aircraft maintenance, repair and overhaul services landed a big contract. Aeronautical Engineers Inc. of Miami announced Friday its selection of the 400,000-square-foot Alabama facility as its fourth authorized conversion center. Commercial Jet’s Dothan facility will provide passenger-to-freight conversions for the 737-300SF, 737-400SF and MD80SF as well as maintenance services to AEI customers. (Sources: al.com, 05/10/13) Previous
Friday, May 10, 2013
Construction set to begin
As Airbus readies for the first concrete pour for its new A320 final assembly line in Mobile, Ala., the company is empowering plant managers to make decisions to assure that its supply chain runs like clockwork. That's what Airbus North America President and CEO Barry Eccleston said May 8 during Aviation Week's Civil Aircraft Manufacturing Conference in Charlotte, N.C. The first concrete footings are to be poured next week for the plant, the fifth Airbus fifth facility in the U.S. but the first to assemble aircraft. It will be a carbon-copy of the A320 factory in Hamburg, Germany, mirroring the process used when the Tianjin, China, plant was built. (Source: Aviation Week, 05/09/13)
Thursday, May 9, 2013
Airbus lands Air China deal
Asia's biggest carrier by market value, Air China, will add 100 Airbus jetliners to help meet rising travel demand. The Beijing-based airline didn't specify a timeframe or the type of aircraft it's buying. But analysts believe the order is mainly A320 for short-haul routes. Carriers in China will need 5,260 new planes worth $670 billion through 2031, Boeing forecast in September. China has become the world's biggest source of tourists, overtaking Germany and the United States. (Source: Bloomberg, 05/07/13) Gulf Coast note: The newest A320 final assembly line is being built in Mobile, Ala.
Subscribe to:
Posts (Atom)



